Data: No standard tables used. Power triangle formulas only. About standard editions

The load

Correction needed

69.2 kVAr
Capacitor reactive power to add
kVAr now
102 kVAr
kVAr after
32.9 kVAr
kVA now
142.9 kVA
kVA after
105.3 kVA
kVA saved
37.6 kVA
Line current now
206.2 A
Line current after
151.9 A
Current saved
54.3 A (26.3%)

Switchboard labels from $2.22 each.

Engraved traffolyte circuit and main switch labels, made in Townsville, posted Australia wide. Order online.

Design switchboard labels

Label the circuit while the numbers are in front of you.

The Formula

The power triangle. Real power (kW) stays put. Capacitors cancel part of the reactive power (kVAr), so the apparent power (kVA) and the current come down.

Qc = P × (tan(acos PF1) − tan(acos PF2))
S = P / PF, I = S × 1000 / (√3 × V)
  • Qc: capacitor kVAr to add
  • P: real power of the load, in kW
  • PF1, PF2: the power factor now and the target
  • S: apparent power, in kVA
  • I: line current. On single phase drop the √3 and use line to neutral volts

Worked Example

A 100 kW load at 400 V three phase, power factor 0.7, corrected to 0.95.

tan(acos 0.7) = 1.0202 and tan(acos 0.95) = 0.3287
Qc = 100 × (1.0202 − 0.3287) = 69.2 kVAr
kVA: 100 / 0.7 = 142.9, then 100 / 0.95 = 105.3. Saves 37.6 kVA
Current: 206.2 A, then 151.9 A. Saves 54.3 A (26.3%)

Questions

How do I calculate the kVAr needed?
kVAr = kW x (tan(acos PF1) - tan(acos PF2)). PF1 is the power factor now, PF2 is the target. 100 kW from PF 0.7 to 0.95 needs 69.2 kVAr.
What does power factor correction save?
Current. The kW stays the same, but the kVA and the line current drop. In the example, 206 A falls to 152 A at 400 V. That frees up room in the cables, the board and the supply.
Should I correct all the way to 1?
Usually not. The last step costs the most for the least. Taking the same 100 kW from 0.95 to 1 needs another 32.9 kVAr and only drops the current from 152 A to 144 A. Over-correcting also makes the load leading.
Will it lower the power bill?
It lowers the kVA. Whether that lowers the bill depends on the tariff. A tariff that charges on kVA demand will show it. Energy charged in kWh does not change.
Can I pick a capacitor bank from this?
It gives you the kVAr. Pick the bank and its steps from the supplier's range, and check the site for harmonics before you fit one.

What customers say

All reviews

5.0 out of 5from 30 reviews

Reviews scroll sideways. Swipe, or use the arrow keys or the Next button, to see more.

“As soon as I had put my order in, Josh was on the phone to me to adjust a few things to make sure it was 100% right. Couldn’t ask for better service and transparency from designing all the way to picking up the labels.”
Callum, CPN ElectricalVerified buyer
“Great service from RBZ 3D. The ordering process was straightforward, communication was clear, and the finished product met our expectations. Delivery was prompt, and the quality was excellent. We'd happily use RBZ 3D again and recommend them to others.”
JoshVerified buyer
“Was so easy to order & to have them personally delivered was great”
Janeen, ElectricianVerified buyer
“⭐⭐⭐⭐⭐ Absolutely stoked with my order from RBZ 3D! Josh made the name plaques for my LEGO polybag minifigure collection, and the quality is excellent. They look fantastic and really finish off the display. On top of the very fast turnaround, they included 20 extra plaques at no cost! I couldn’t spot a single fault with any of the extras either—an incredibly generous touch that was much appreciated. A huge thank-you to Josh for going above and beyond. Brilliant quality, fast service and a business I’d happily recommend. Five stars well deserved! 🤙”
JamieVerified buyer
“This service is great. The designer is extremely flexible, and you can store your own made templates or choose from pre-made templates. Sizes and colours, sticky back or not, it's just what I needed. Also, the label quality is very high. Will be using these guys repeatedly!”
Neil, FloveyorVerified buyer
“We are fairly new to Josh, but I cannot fault his prices, service and quick turnaround. He provides high-quality accurate labelling at a very competitive price. Recommended highly.”
Mark, MARK BULL ELECTRICAL ROCKHAMPTONVerified buyer
“Prompt service, good quality. Main earth and earth bond”
RonVerified buyer
“Great communication, fast turn around and shipping and well packaged. The product is also excellent quality. Will definitely order from here again.”
MagdaleneVerified buyer
“Great quality labells as ordered, will order again.”
Brett, ElectricianVerified buyer
“QUICK TURNAROUND, VERY PROFESSIONAL AND ACCURATE”
Mark, MARK BULL ELECTRICALVerified buyer
“Everything was easy from ordering to delivery”
JaneenVerified buyer
“My order was processed quickly and the final product met or exceeded my expectations.”
Stewart V-PVerified buyer