Commissioning

PID Tuning Calculator

Calculate controller tuning parameters from open-loop step test data using multiple methods.

For reference only — always verify tuning parameters on-site during commissioning. Start with conservative values and increase gain incrementally. These calculations assume a first-order-plus-dead-time (FOPDT) process model.

Step Response Data

Process Model (FOPDT)

Delta PV / Delta Output (%)

Time before PV responds

Time to reach 63.2% of change

Controller Settings

Most temperature/pressure loops are reverse acting

Lambda Tuning Parameter

1x (Faster)3x (Default)5x (Slower)