Commissioning

PID Tuning Calculator

Calculate controller tuning parameters from open-loop step test data using multiple methods.

For reference only — always verify tuning parameters on-site during commissioning. Start with conservative values and increase gain incrementally. These calculations assume a first-order-plus-dead-time (FOPDT) process model.

Step Response Data

Process Model (FOPDT)

Delta PV / Delta Output (%)

Time before PV responds

Time to reach 63.2% of change

Controller Settings

Most temperature/pressure loops are reverse acting

Lambda Tuning Parameter

1x (Faster)3x (Default)5x (Slower)

Need labels for your control panels?

Design and order custom switchboard labels with our online label designer.

Design Labels Now